Chinese Forklift Truck 2.5 Ton Mini Electric Forklift
Product specification
1) Wide view forklift mast, it is suitable for hard and rugged terrain working condition.
2) It is tires are big patterm, wideth tires, It is specialized designed for hard , terrain road and way.
3) Working condition of cross-country road is rugged, obstacles in the way.
4) The driving axle is conbined in Cast steel structure, it get more stength and reliable.
ITEM |
SPECIFICATION |
ITEM |
SPECIFICATION |
Characteristics |
|
Dimensions |
|
Load capacity |
2500kg |
Total length with fork |
3650mm |
Load center |
500mm |
Total length without fork |
2580mm |
Lift height |
3000mm |
Total width |
1160mm |
Full free lift height |
100mm |
Mast extended height |
4220mm |
Fork dimension |
1070×122×40mm |
Mast lowered height |
2060mm |
Mast tilting angle |
6/12 |
Chassis |
|
Min.turning radius |
2240mm |
Tyres Front |
7.00-12-12PR |
Groud clearance |
120mm/130mm |
Type Rear |
6.00-9-10PR |
Overhead guard height |
2160mm |
Wheelbase |
1600mm |
Front overhang |
450mm |
Tread |
970mm |
Performance |
|
Service weight |
3880kg |
Max travel speed |
19km/h |
Drive |
|
Max lift speed |
500mm/s |
Battery |
12v/80Ah |
Max.traction power |
18kw |
motor model |
Xinchai 490 |
Max. gradeability |
20% |
Rated output |
40kw/2650rpm |
Fuel tank capacity |
60L |
Rated torque |
162Nm/1900rpm |
Transmission |
Hydraulic |
Cylinders |
4 |
Main Specification
--China Xinchai 490 engine 42KW.
--Automatic transmission.
--2-stage 3000mm mast.
--Side shifter.
--1070mm fork.
--Pneumatic tire.
--Top-grade seat.
--Warning and AR light.
--Special-radiator for top hot area.
Certifications
All the machine with CE ISO SGS certificate.
Packaging Details
TITAN Transport packaging team helps our customer to transport their machine in safe and secure way without any damage. Close to Qingdao port, we have the natural advantage to deliver your cargo safe, on time with competitive freight cost.
Main Products
OUR SERVICE
Our trained Professional service team offers high quality in-time service in a very friendly way.
For a good customer experience, the content of pre -sales includes the recommendation on the right products basis on condition. All you have to do is to inform us your needs.
For After-sales, to minimize the downtime, we offer air delivery for the spare parts which are within guarantee within 3 working days. We have professional technician to support trouble clearing and maintenance.
Pre-Sales Service
(1) Inquiry and consulting support.
(2)Sample testing support.
(3)View our Factory.
One year guarantee for whole machine main parts.
24 hours technical support by email.
User manual and details videos or CD if you requested For each forklift
After-Sales Service
(1)Training how to instal the machine, training how to use the machine.
(2)Engineers available to service machinery overseas.
About Us
Our company Weihai Titan Heavy Machinery ,We are a professional wheel loader and excavator factory in China,owns more than 11 years experiences on producing and exporting wheel loader.We are actively trying to develop agents all over the world, looking forward to cooperating with you.
FAQ
Q:Why choose Titan?
We sell every machine at a fair price.As our production increases,we are getting much support from the purchase source of raw meterial.
We leave the maximum profit to customer.
1) Titan: an experienced loader manufacturer with over 11 years.
2) Titan team: customers-focused,you'll get reply within 5 minutes.
3)Titan: premium quality with reasonable price.
4) Titan: CE,BV,SGS,ROPS and FOPS,ISO9001:2008 varified.
The quality control is not an empty word in TITAN.Our products are tested and granted CE cetificate.
Q:What is Titan warranty?
TITAN has a professional sales and after-service team.We are trying our best to make a good service for every customer.
1) Titan after-sales: life-long, meantime offer one year and one month warranty.
2) Titan proposal: order some wearing parts with loader for easy maintenance.
Q:What about Titan delivery term?
TITAN Transport packsging team helps our customer to transport their machine in safe and secure way without any damage.
10-20 days after down payment received.
Q:What about the payment term?
30% advance payment,70% balance by T/T.