TITAN Top brand Hot sales construction works 3 Ton Front End Loader wheel loade
Product Description
This loader is a kind of earth-rock construction machinery widely used in highway, railway, construction, port, mine and other construction projects. It is mainly used for loading and unloading bulk materials such as soil, sand, lime and coal, , Hard soil for light shoveling operations. Dressing different auxiliary work device can also be bulldozing, lifting and other materials such as timber loading and unloading operations. In roads, especially in high-grade road construction.
1) 8Ton operating weight,heavy duty
2) Maximum speed 36km/h,fast!
3) Dumping height: 3500mm
4) Luxury appearance
5) With many attachments,all configuratin customer can choose.
6) safe and comfortable cabs. comfortable seat allowing the operator to work in confidence and to focus on a productive working day.
7) up to 10% lower fuel consumption.
8) highest payloads and tipping loads.
9) low operating costs.
10) easy to operate.
11) with substantial loading capacity, powerful digging force and impressive travel speeds, they are extremely productive.
12) Fuel-efficient and easy to maintain , they offer reduced running costs.
ITEM |
SPECIFICATION |
ITEM |
SPECIFICATION |
Overall working weight |
8000kg |
Max. speed |
36Km/h |
Rated load |
3000kg |
Main transmission type |
Spiral gear, first stage decelerate
|
Max. tractive force |
65KN |
Tyre specification |
17.5-2 |
Max. breakout force |
≥65KN |
Front tyre pressure |
275KPa |
Max. gradeability |
30° |
Rear tyre pressure |
275KPa |
Max. dumping height |
3500mm
|
Type |
Articulated load-sensing hydraulic steering system
|
Dumping distance |
950mm |
Steering angle |
±35° |
Overall dimension (L×W×H) |
6470×2120×2960mm |
Mini turning radius
|
5200mm
|
Model |
Weichai WP6G160E20 |
system working pressure |
16MPa |
Type |
Inline, water cooling, dry cylinder, direct injection |
Boom lifting time |
6s |
Number of cylinder-bore/stroke |
6-108×125mm
|
Total time
|
11s |
Rated power |
92kW |
Rated speed |
2200r/min |
Transmission type |
Planetary power shift |
Service brake |
Air-on-oil, caliper-disk |
Grear shift |
4 forwardshift, 4 reverseshift |
parking brake |
Manual caliper disc |
Fuel |
80L |
Torque converter |
Single-stage |
Attachments
Titan wheel loader adopts the Hydraulic Quick Hitch. All kinds of accessories can be replaced. Such as: log grapple, grab bucket, pallet fork, road sweeper, ripper, 4 in 1 bucket, snow blade, angle blade, grass fork, hay fork, screening bucket, hydraulic hammer, stick rake,auger and so on.
Packaging Details
TITAN Transport packaging team helps our customer to transport their machine in safe and secure way without any damage. Close to Qingdao port, we have the natural advantage to deliver your cargo safe, on time with competitive freight cost.
About Us
Weihai Titan Heavy Machinery Co., Ltd, a professional engineering machinery manufacturer with 11 years experience. Our core competencies is mini-medium-sized wheel loader. Hopefully to become your trustworthy loader supplier in China.
FAQ
Q:Why choose Titan?
We sell every machine at a fair price.As our production increases,we are getting much support from the purchase source of raw meterial.
We leave the maximum profit to customer.
1) Titan: an experienced loader manufacturer with over 11 years.
2) Titan TEAM: customers-focused,you'll get reply within 5 minutes.
3)Titan: premium quality with reasonable price.
4) Titan: CE,BV,SGS,ROPS and FOPS,ISO9001:2008 varified.
The quality control is not an empty word in TITAN.Our products are tested and granted CE cetificate.
Q:What is Titan warranty?
TITAN has a professional sales and after-service team.We are trying our best to make a good service for every customer.
1) Titan after-sales: life-long, meantime offer one year and one month warranty.
2) Titan proposal: order some wearing parts with loader for easy maintenance.
Q:What about Titan delivery term?
TITAN Transport packsging team helps our customer to transport their machine in safe and secure way without any damage.
10-14 days after down payment received.
Q:What about the payment term?
30% advance payment,70% balance by T/T.